Factory Review


Dept. number Q.C. trained
Q.C. Manager 1 Supervising the quality controlling work of whole team, holding the monthly training, dealing with the irregular problems happening to production.
Material warehouse 4 Fabrics and accessories quality-check
Preparation Dept. 6 Cutted fabrics and prepared accessories quality-control
Production lines 15 Half-finished products quality check (check each piece)
15 Finished products quality check (check each piece)
After-production 16 Overall check, checking products before packing
5 Ex. Factory check, random check before loading container

Production capacity: Currently PEAKTOUR has 5 workshops specialized in bags with different fabrics and workmanship, details as follows: ( workers number is changeable, data based on Jan. 2007, the monthly output based on midium-difficulties products after workers start to get familiar with the production, usually 5-8 days from the production-beginning).

Workshop Machines Workers when full Present workers Monthly output
PEAKTOUR 1 180 300 240 200,000 pcs
PEAKTOUR 2 450 600 560 400,000 pcs
PEAKTOUR 3 120 200 180 100,000 pcs
PEAKTOUR 4 160 260 210 150,000 pcs
PEAKTOUR 5 100 150 120 80,000 pcs
TOTAL 1010 1510 1310 930,000 pcs

Machines details: (not including assisting machines)

Machine

Work Shop
Hydraulic cutting machine (width 2m) (made in Taiwan) High-speed, 1-needle stitch machines High-speed, 2-needle stitch machines High-speed, 1-needle lock stitch machines Computer-controlled pattern sewing machines Computerized lockstitch bar tacker
PEAKTOUR 1 3 150 10 8 4 4
PEAKTOUR 2 4 360 40 22 15 8
PEAKTOUR 3 1 100 6 6 0 2
PEAKTOUR 4 2 130 8 6 4 2
PEAKTOUR 5 1 85 5 3 0 2
TOTAL 11 825 69 45 23 18